ISO 24516-3:2017
(Main)Guidelines for the management of assets of water supply and wastewater systems — Part 3: Wastewater collection networks
Guidelines for the management of assets of water supply and wastewater systems — Part 3: Wastewater collection networks
ISO 24516-3:2017 specifies guidelines for technical aspects, tools and good practices for the management of assets of wastewater networks to maintain value from existing assets. ISO 24516-3:2017 does not apply to the management of assets of treatment plants, which are also physically part of the wastewater system and can influence the management of network assets. NOTE 1 The management of the following individual assets will be covered by ISO 24516‑4: wastewater pumping stations, retention and detention in the network, wastewater treatment plants and sludge treatment facilities. ISO 24516-3:2017 includes examples of good practice approaches on the strategic, tactical and operational levels. ISO 24516-3:2017 is applicable to all types and sizes of organizations and/or utilities operating wastewater networks, and all different roles/functions for the management of assets within a utility (e.g. asset owner/responsible body, asset manager/operator, service provider/operator). NOTE 2 Depending on the size and structure of an organization, the utility can decide to what extent it applies the guidance in this document, but in any case, the philosophy of this document remains applicable to small and medium utilities.
Lignes directrices pour la gestion d'actifs des systèmes d'eaux usées et d'eau potable — Partie 3: Réseaux d'assainissement
ISO 24516-3:2017 spécifie des lignes directrices concernant les aspects techniques, les outils et les bonnes pratiques en matière de gestion d'actifs des réseaux d'assainissement pour préserver la valeur des actifs existants. ISO 24516-3:2017 ne s'applique pas à la gestion des actifs des stations de traitement qui font aussi partie, concrètement, du système d'assainissement et peuvent influer sur la gestion des actifs du réseau. NOTE 1 La gestion des actifs suivants sera traitée par l'ISO 24516‑4: stations de pompage des eaux usées, rétention et récupération dans le réseau, stations d'épuration des eaux usées et installations de traitement des boues. ISO 24516-3:2017 comporte des exemples d'approches représentant des bonnes pratiques aux niveaux stratégique, tactique et opérationnel. ISO 24516-3:2017 s'applique à tous les types et à toutes les tailles d'organismes et/ou de services publics exploitant des réseaux d'assainissement ainsi qu'à tous les différents rôles/fonctions de gestion des actifs au sein d'un service public (par exemple, propriétaire des actifs/organisme responsable, gestionnaire des actifs/exploitant, prestataire de service/exploitant). NOTE 2 En fonction de la taille et de la structure de l'organisme, le service public peut décider de la mesure dans laquelle il applique les recommandations du présent document, mais, en tout état de cause, les principes du présent document restent applicables aux services d'assainissement de petite et moyenne tailles.
General Information
Standards Content (Sample)
INTERNATIONAL ISO
STANDARD 24516-3
First edition
2017-09
Guidelines for the management of
assets of water supply and wastewater
systems —
Part 3:
Wastewater collection networks
Lignes directrices pour la gestion d'actifs des systèmes d'eaux usées et
d'eau potable —
Partie 3: Réseaux d'assainissement
Reference number
©
ISO 2017
© ISO 2017, Published in Switzerland
All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized otherwise in any form
or by any means, electronic or mechanical, including photocopying, or posting on the internet or an intranet, without prior
written permission. Permission can be requested from either ISO at the address below or ISO’s member body in the country of
the requester.
ISO copyright office
Ch. de Blandonnet 8 • CP 401
CH-1214 Vernier, Geneva, Switzerland
Tel. +41 22 749 01 11
Fax +41 22 749 09 47
copyright@iso.org
www.iso.org
ii © ISO 2017 – All rights reserved
Contents Page
Foreword .v
Introduction .vi
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 Principal aspects of the management of assets . 5
4.1 Objectives and requirements . 5
4.1.1 Objectives . 5
4.1.2 Functional requirements . 5
4.1.3 Performance requirements . 6
4.2 General aspects . 8
4.2.1 General. 8
4.2.2 Principal aspects — Wastewater utilities . 8
4.2.3 Principal aspects — Wastewater systems . 9
4.2.4 Integrating the principal aspects . 9
4.3 Specific aspects . 9
4.3.1 Risk . 9
4.3.2 Life cycle .11
4.4 Structuring the process for the management of assets.11
4.4.1 General.11
4.4.2 Strategies for the management of assets .12
4.4.3 Periods of planning .13
4.4.4 Strategic level activities .14
4.4.5 Tactical level activities .14
4.4.6 Operational level activities .14
5 Investigation .15
5.1 General .15
5.2 Purpose of investigation .15
5.3 Determine the scope of the investigation .15
5.4 Types of investigation .16
5.4.1 Hydraulic investigation .16
5.4.2 Environmental investigation .16
5.4.3 Structural investigation .16
5.4.4 Operational investigation .17
5.5 Data collection .17
5.5.1 General.17
5.5.2 Data requirements . . .17
5.5.3 Inventory data .17
5.5.4 Failure data .18
5.5.5 Further condition data . .19
5.6 Data registering and data assignment .20
5.6.1 Data registering .20
5.6.2 Data assignment .21
5.6.3 Geo-referencing .21
5.7 Review existing information .21
5.8 Inventory update .21
5.9 Review of performance information .21
5.10 Planning of investigation .22
5.11 Performance testing .22
6 Assessment .23
6.1 Principles .23
6.2 Assessment of the hydraulic performance .23
6.3 Assessment of environmental impact .23
6.4 Assessment of structural condition .24
6.5 Assessment of operational performance .24
6.6 Comparison with performance requirements .24
6.7 Identification of unacceptable impacts .24
6.8 Identification of causes of performance deficiencies .24
7 Planning .24
7.1 General .24
7.2 Develop integrated solutions .25
7.3 Assess solutions .26
7.4 Prepare an action plan .26
8 Implementation .29
8.1 General .29
8.2 Create/update plan .29
8.3 Carry out work .29
8.4 Monitor performance .30
8.5 Review performance .30
9 Operation and maintenance .30
9.1 General .30
9.2 Operation .31
9.3 Maintenance .
...
NORME ISO
INTERNATIONALE 24516-3
Première édition
2017-09
Lignes directrices pour la gestion
d'actifs des systèmes d'eaux usées et
d'eau potable —
Partie 3:
Réseaux d'assainissement
Guidelines for the management of assets of water supply and
wastewater systems —
Part 3: Wastewater collection networks
Numéro de référence
©
ISO 2017
DOCUMENT PROTÉGÉ PAR COPYRIGHT
© ISO 2017, Publié en Suisse
Droits de reproduction réservés. Sauf indication contraire, aucune partie de cette publication ne peut être reproduite ni utilisée
sous quelque forme que ce soit et par aucun procédé, électronique ou mécanique, y compris la photocopie, l’affichage sur
l’internet ou sur un Intranet, sans autorisation écrite préalable. Les demandes d’autorisation peuvent être adressées à l’ISO à
l’adresse ci-après ou au comité membre de l’ISO dans le pays du demandeur.
ISO copyright office
Ch. de Blandonnet 8 • CP 401
CH-1214 Vernier, Geneva, Switzerland
Tel. +41 22 749 01 11
Fax +41 22 749 09 47
copyright@iso.org
www.iso.org
ii © ISO 2017 – Tous droits réservés
Sommaire Page
Avant-propos .v
Introduction .vi
1 Domaine d'application . 1
2 Références normatives . 1
3 Termes et définitions . 1
4 Principaux aspects de la gestion d’actifs . 5
4.1 Objectifs et exigences . 5
4.1.1 Objectifs . 5
4.1.2 Exigences fonctionnelles . 5
4.1.3 Exigences de performance . 6
4.2 Aspects généraux . 8
4.2.1 Généralités . 8
4.2.2 Aspects principaux — Services d’assainissement . 8
4.2.3 Aspects principaux — Système d’assainissement . 9
4.2.4 Intégration des aspects principaux . 9
4.3 Aspects spécifiques .10
4.3.1 Risques .10
4.3.2 Cycle de vie .11
4.4 Structuration du processus de gestion d’actifs .12
4.4.1 Généralités .12
4.4.2 Stratégies liées à la gestion d’actifs .13
4.4.3 Périodes de planification .13
4.4.4 Activités liées au niveau stratégique.14
4.4.5 Activités liées au niveau tactique .15
4.4.6 Activités liées au niveau opérationnel .15
5 Investigation .15
5.1 Généralités .15
5.2 Objectif de l'investigation .16
5.3 Détermination de la portée de l'investigation .16
5.4 Types d’investigation .16
5.4.1 Investigation hydraulique .16
5.4.2 Investigation environnementale .17
5.4.3 Investigation structurelle .17
5.4.4 Investigation opérationnelle.17
5.5 Collecte des données .18
5.5.1 Généralités .18
5.5.2 Exigences en matière de données .18
5.5.3 Données d'inventaire .18
5.5.4 Données de défaillance .19
5.5.5 Données supplémentaires relatives à l'état .20
5.6 Enregistrement et assignation des données.21
5.6.1 Enregistrement des données .21
5.6.2 Attribution des données .22
5.6.3 Référencement géographique .22
5.7 Revue des informations existantes .22
5.8 Mise à jour de l'inventaire .23
5.9 Revue des informations de performance .23
5.10 Planification de l'investigation .23
5.11 Essais de performance .23
6 Évaluation .24
6.1 Principes .24
6.2 Évaluation de la performance hydraulique .25
6.3 Évaluation de l'impact sur l’environnement .25
6.4 Évaluation de l’état structurel.25
6.5 Évaluation des performances opérationnelles .26
6.6 Comparaison avec les exigences de performance.26
6.7 Identification des impacts inacceptables .26
6.8 Identification des causes de l’insuffisance des performances .26
7 Planification .26
7.1 Généralités .26
7.2 Élaboration de solutions intégrées .27
7.3 Évaluation des solutions .28
7.4 Préparation d'un plan d’action .28
8 Mise en œuvre .31
8.1 Généralités .31
8.2 Élaboration/actualisation du plan .31
8.3 Exécution des travaux .32
8.4 Surveillance des performances .32
8.5 Revue des performances .32
9 Exploitation et maintenance .32
9.1 Généralités .32
9.2 Exploitation.33
9.3 Maintenance .34
10 Réhabilitation .34
10.1 Généralités .
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.