General Information

Abstract

IEC 63402-2-2:2026 specifies the fundamental aspects of semantic interoperability for the S2 interface and the related data exchange between a CEM and the resource managers within the premises. It provides a technology independent set of data models and interaction patterns in order to enable applications for energy management within the premises. This document does not include:
– mappings to concrete data representations (XML, JSON and similar);
– mappings to application protocols for the message passing;
– security related aspects.
This group EE publication is primarily intended to be used as an EE standard for the products mentioned in the scope, but is also intended to be used by TCs in the preparation of publications for products which are included in the boundary mentioned in the scope of this document

Status
Published
Publication Date
24-Aug-2026
Drafting Committee
WG 3 - TC 23/SC 23K/WG 3
Current Stage
PPUB - Publication issued
Start Date
25-Aug-2026
Completion Date
31-Jul-2026

Buy Documents

Standard

iec63402-2-2{ed1.0}en - Energy efficiency - Customer energy management system - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource managers

ISBN:978-2-8327-1442-3
Release Date:25-Aug-2026
English and French language (218 pages)
sale 15% off
Preview
sale 15% off
Preview
Standard

iec63402-2-2{ed1.0}fr - Systemes pour l'efficacité énergétique - Systemes de gestion d'énergie client - Part 2-2: Modele de données et messagerie - Interface entre le gestionnaire d'énergie client et les gestionnaires de ressources pour foyers domestiques/bâtiments

ISBN:978-2-8327-1442-3
Release Date:25-Aug-2026
English and French language (218 pages)
sale 15% off
Preview
sale 15% off
Preview

Overview

IEC 63402-2-2:2026 is an international standard developed by the International Electrotechnical Commission (IEC). This standard addresses energy efficiency in customer energy management systems (CEMs), focusing on the data model and messaging interface (S2 interface) between the customer energy manager and resource managers within a premises.

Its primary aim is to define the fundamentals of semantic interoperability for data exchange, facilitating communication and interaction between the CEM and various resource managers (e.g., energy producers, storage systems, appliances). The standard is technology-independent and strictly addresses data models and interaction patterns, excluding specific data representations (such as XML or JSON), application protocol mappings, and security considerations.

Key Topics

  • Semantic Interoperability: Ensures consistent understanding of information exchanged between CEMs and resource managers by specifying shared data models and interaction semantics.
  • Data Models and Types: Provides a comprehensive set of data types relevant for energy management-such as power forecasting, power measurement, control types, roles (producers, consumers, storage), and events (status updates, transitions).
  • Interaction Patterns: Defines generic tasks and communication procedures for updating resource manager details, activating and updating control types, communicating measurements, and handling power forecasts.
  • Control Mechanisms: Describes multiple control paradigms, including:
    • Power envelope-based control
    • Power profile-based control
    • Mode of operation-based control
    • Fill level/rate of charge control
    • Demand-driven control
  • Communication Tasks: Outlines how CEMs and resource managers exchange and update information regarding constraints, profiles, statuses, commands, and forecasts.
  • Use Cases: The annex includes high-level use cases for configuration, planning, and operational management, supporting practical energy optimization strategies within premises.

Applications

IEC 63402-2-2:2026 is widely applicable to stakeholders in the smart energy and building management ecosystem:

  • Manufacturers of Energy Management Systems (EMS): Reference for designing interoperable CEMs and resource controllers, enabling seamless integration of diverse equipment (e.g., HVAC, home automation, EV chargers).
  • Building Automation Integrators: Foundation for implementing semantic data exchange in commercial, residential, or industrial buildings aiming for efficient energy use.
  • Grid Operators and Aggregators: Supports demand-side management, load balancing, and integration of distributed energy resources by ensuring reliable interface standards.
  • Developers of Smart Appliances: Ensures their products can participate in energy management schemes for smarter, optimized operations.
  • Standards Committees and Regulatory Bodies: Provides a base standard to harmonize energy-related communication across different device types and applications.

By enabling technology-agnostic interfaces, IEC 63402-2-2 supports multi-vendor environments and future-proofs energy management applications.

Related Standards

  • IEC 63402 Series: The broader standard series addressing various aspects of customer energy management.
  • ISO 15118: Covers vehicle-to-grid communication interface, relevant for electric vehicle integration cases mentioned in the use cases.
  • IEC 61850: Focuses on communication networks and systems for power utility automation, offering complementary definitions for substation and distributed energy resource integration.
  • IEC 61968/61970: Addresses application integration at electric utilities, particularly distribution management.
  • IEC Common Data Dictionaries (CDD, Electropedia): For standardized terminology, critical for semantic interoperability.

Keywords

IEC 63402-2-2, energy efficiency standard, customer energy management system, CEM, resource manager interface, data model, semantic interoperability, S2 interface, energy management, smart grid, building automation, energy control, power forecasting, IEC standards, energy data exchange, smart premises.

Buy Documents

Standard

iec63402-2-2{ed1.0}en - Energy efficiency - Customer energy management system - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource managers

ISBN:978-2-8327-1442-3
Release Date:25-Aug-2026
English and French language (218 pages)
sale 15% off
Preview
sale 15% off
Preview
Standard

iec63402-2-2{ed1.0}fr - Systemes pour l'efficacité énergétique - Systemes de gestion d'énergie client - Part 2-2: Modele de données et messagerie - Interface entre le gestionnaire d'énergie client et les gestionnaires de ressources pour foyers domestiques/bâtiments

ISBN:978-2-8327-1442-3
Release Date:25-Aug-2026
English and French language (218 pages)
sale 15% off
Preview
sale 15% off
Preview

Get Certified

Connect with accredited certification bodies for this standard

DNV

DNV is an independent assurance and risk management provider.

NA Norway Verified

BSI Group

BSI (British Standards Institution) is the business standards company that helps organizations make excellence a habit.

UKAS United Kingdom Verified

Bureau Veritas

Bureau Veritas is a world leader in laboratory testing, inspection and certification services.

COFRAC France Verified

Sponsored listings

Frequently Asked Questions

IEC 63402-2-2:2026 is a standard published by the International Electrotechnical Commission (IEC). Its full title is "Energy efficiency - Customer energy management system - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource managers". This standard covers: IEC 63402-2-2:2026 specifies the fundamental aspects of semantic interoperability for the S2 interface and the related data exchange between a CEM and the resource managers within the premises. It provides a technology independent set of data models and interaction patterns in order to enable applications for energy management within the premises. This document does not include: – mappings to concrete data representations (XML, JSON and similar); – mappings to application protocols for the message passing; – security related aspects. This group EE publication is primarily intended to be used as an EE standard for the products mentioned in the scope, but is also intended to be used by TCs in the preparation of publications for products which are included in the boundary mentioned in the scope of this document

IEC 63402-2-2:2026 specifies the fundamental aspects of semantic interoperability for the S2 interface and the related data exchange between a CEM and the resource managers within the premises. It provides a technology independent set of data models and interaction patterns in order to enable applications for energy management within the premises. This document does not include: – mappings to concrete data representations (XML, JSON and similar); – mappings to application protocols for the message passing; – security related aspects. This group EE publication is primarily intended to be used as an EE standard for the products mentioned in the scope, but is also intended to be used by TCs in the preparation of publications for products which are included in the boundary mentioned in the scope of this document

IEC 63402-2-2:2026 is classified under the following ICS (International Classification for Standards) categories: 03.100.70 - Management systems; 27.015 - Energy efficiency. Energy conservation in general; 29.020 - Electrical engineering in general. The ICS classification helps identify the subject area and facilitates finding related standards.

IEC 63402-2-2:2026 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)


IEC 63402-2-2 ®
Edition 1.0 2026-08
INTERNATIONAL
STANDARD
HORIZONTAL PUBLICATION
GROUP ENERGY EFFICIENCY PUBLICATION
Energy efficiency - Customer energy management system -
Part 2-2: Data model and messaging - Interface between the customer energy
manager and resource managers
ICS 03.100.70; 27.015; 29.020  ISBN 978-2-8327-1442-3

All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or
by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from either
IEC or IEC's member National Committee in the country of the requester. If you have any questions about IEC copyright
or have an enquiry about obtaining additional rights to this publication, please contact the address below or your local
IEC member National Committee for further information.

IEC Secretariat Tel.: +41 22 919 02 11
3, rue de Varembé info@iec.ch
CH-1211 Geneva 20 www.iec.ch
Switzerland
About the IEC
The International Electrotechnical Commission (IEC) is the leading global organization that prepares and publishes
International Standards for all electrical, electronic and related technologies.

About IEC publications
The technical content of IEC publications is kept under constant review by the IEC. Please make sure that you have the
latest edition, a corrigendum or an amendment might have been published.

IEC publications search - IEC Products & Services Portal - products.iec.ch
webstore.iec.ch/advsearchform Discover our powerful search engine and read freely all the
The advanced search enables to find IEC publications by a publications previews, graphical symbols and the glossary.
variety of criteria (reference number, text, technical With a subscription you will always have access to up to date
committee, …). It also gives information on projects, content tailored to your needs.
replaced and withdrawn publications.
Electropedia - www.electropedia.org
The world's leading online dictionary on electrotechnology,
IEC Just Published - webstore.iec.ch/justpublished
Stay up to date on all new IEC publications. Just Published containing more than 22 500 terminological entries in English
details all new publications released. Available online and and French, with equivalent terms in 25 additional languages.
once a month by email. Also known as the International Electrotechnical Vocabulary
(IEV) online.
IEC Customer Service Centre - webstore.iec.ch/csc
If you wish to give us your feedback on this publication or
need further assistance, please contact the Customer
Service Centre: sales@iec.ch.
CONTENTS
FOREWORD . 8
Introduction. 10
1 Scope . 11
2 Normative references . 11
3 Terms, definitions and abbreviated terms . 11
3.1 Terms and definitions. 11
3.2 Abbreviated terms . 14
4 Energy management . 14
4.1 Architectural overview . 14
4.2 Description . 15
4.3 Energy management roles . 16
4.3.1 General . 16
4.3.2 Energy producer role . 17
4.3.3 Energy consumer role . 17
4.3.4 Energy storage role . 18
5 Resource manager . 19
6 Customer energy manager (CEM). 20
6.1 General . 20
6.2 Local optimization . 20
6.3 Implicit control . 21
6.4 Explicit control . 21
6.5 Summary . 22
7 Energy management concepts . 22
7.1 General . 22
7.2 Design philosophy . 22
7.3 Abnormal condition . 23
7.4 Power measurements . 23
7.5 Power forecasts . 23
7.6 Control types . 24
7.6.1 General . 24
7.6.2 Power envelope based control . 24
7.6.3 Power profile based control . 29
7.6.4 Operation mode based control . 30
7.6.5 Fill rate based control . 33
7.6.6 Demand driven based control . 35
8 Energy management data models . 37
8.1 Basic data types . 37
8.1.1 General . 37
8.1.2 Common concepts related to time . 37
8.1.3 Common concepts related to identifiers . 38
8.1.4 Common concepts related to strings . 38
8.1.5 Meaning of optionality . 38
8.2 Resource manager . 39
8.2.1 ResourceManagerDetails . 39
8.2.2 PowerValue . 39
8.2.3 PowerForecastValue. 40
8.2.4 PowerRange . 40
8.2.5 NumberRange . 40
8.2.6 PowerMeasurement . 41
8.2.7 Role . 41
8.2.8 ReceptionStatus . 41
8.2.9 Transition . 41
8.2.10 Timer . 42
8.2.11 InstructionStatusUpdate . 42
8.3 Power forecast . 42
8.3.1 Description . 42
8.3.2 PowerForecast . 43
8.3.3 PowerForecastElement . 44
8.4 Control types . 44
8.4.1 Power envelope based control . 44
8.4.2 Power profile based control . 47
8.4.3 Operation mode based control . 50
8.4.4 Fill rate based control . 52
8.4.5 Demand driven based control . 57
8.5 Enumerations . 60
8.5.1 RoleType . 60
8.5.2 Commodity . 60
8.5.3 CommodityQuantity . 61
8.5.4 Currency . 61
8.5.5 InstructionStatus . 62
8.5.6 ControlType . 63
8.5.7 PowerForecastType . 63
8.5.8 PEBC.PowerEnvelopeLimitType . 64
8.5.9 PEBC.PowerEnvelopeConsequenceType . 64
8.5.10 ReceptionStatusValues . 64
8.5.11 PPBC.PowerSequenceStatus . 64
9 Communication . 65
9.1 General . 65
9.2 Generic tasks . 66
9.2.1 Update resource manager details . 66
9.2.2 Activate control type . 66
9.2.3 Update active control type . 67
9.2.4 Communicate power measurement . 67
9.2.5 Update power forecast . 67
9.2.6 Revoke power forecast . 68
9.3 Power envelope based control tasks . 68
9.3.1 Update power constraints . 68
9.3.2 Revoke power constraints . 69
9.3.3 Update power plan. 69
9.3.4 Update energy constraints . 70
9.3.5 Revoke energy constraints . 70
9.3.6 Process instruction . 71
9.3.7 Revoke instruction . 72
9.4 Power profile based control tasks . 72
9.4.1 Update power profile definition . 72
9.4.2 Revoke power profile definition . 73
9.4.3 Update power profile status . 73
9.4.4 Process schedule instruction . 73
9.4.5 Revoke schedule instruction . 74
9.4.6 Process start interruption instruction . 75
9.4.7 Revoke start interruption instruction . 75
9.4.8 Process end interruption instruction . 76
9.4.9 Revoke end interruption instruction . 76
9.5 Operation mode based control tasks . 77
9.5.1 Update system description . 77
9.5.2 Revoke system description . 77
9.5.3 Update status . 78
9.5.4 Update timer status . 78
9.5.5 Process instruction . 79
9.5.6 Revoke instruction . 79
9.6 Fill rate based control tasks . 80
9.6.1 Update system description . 80
9.6.2 Revoke system description . 80
9.6.3 Update actuator status. 81
9.6.4 Update storage status . 81
9.6.5 Update timer status . 81
9.6.6 Update leakage behaviour . 82
9.6.7 Revoke leakage behaviour . 82
9.6.8 Update usage forecast . 83
9.6.9 Revoke usage forecast . 83
9.6.10 Update fill level target profile . 84
9.6.11 Revoke fill level target profile. 84
9.6.12 Process instruction . 85
9.6.13 Revoke instruction . 85
9.7 Demand driven based control tasks . 86
9.7.1 Update system description . 86
9.7.2 Revoke system description . 86
9.7.3 Update actuator status. 87
9.7.4 Update timer status . 87
9.7.5 Update average demand rate forecast . 87
9.7.6 Revoke average demand rate forecast . 88
9.7.7 Process instruction . 88
9.7.8 Revoke instruction . 89
Annex A (informative) Use cases . 90
A.1 Overview . 90
A.2 Organizing . 91
A.2.1 UC_EM_O100: Configuring CEM in network . 91
A.2.2 UC_EM_O101: Configuring master CEM with smart grid operator
credentials . 91
A.3 Scheduling . 92
A.4 Management . 92
A.4.1 UC_EM_M300: CEM selects alternative energy sequences by energy
costs . 92
A.4.2 UC_EM_M301 CEM modifies start time of energy sequence . 93
A.4.3 UC_EM_M302: CEM changes an energy profile to make temporary use
of stored energy . 93
A.4.4 UC_EM_M303: Demanded power cannot be delivered by domestic grid . 94
A.4.5 UC_EM_M304: Two electric vehicles conflicting in their power load . 94
A.4.6 UC_EM_M305: EMG requests temporarily energy saving . 95
A.4.7 UC_EM_M306: Energy storage requests high priority . 96
A.5 Case studies . 97
A.5.1 UC_EM_M307 Charging an EV in the context of Power Limitation PV
with the dynamic control mode of ISO 15118-20 . 97
A.5.2 UC_EM_M308: Charging an EV in the context of Power Limitation PV
with the scheduled control mode of ISO 15118 (series) [10] and
monetary incentives . 98
Bibliography . 100

Figure 1 – Architectural overview of Premises smart grid system . 15
Figure 2 – Example of how different power profiles can achieve the same target state . 16
Figure 3 – Example resource manager and HBES or BACS or smart appliance or
device combinations, or any combinations of these . 19
Figure 4 – Example of a PEBC.Instruction from the CEM containing a PowerEnvelope . 25
Figure 5 – Example of how a PowerEnvelope and a PowerForecast of type GENUINE
result in a PowerForecast of type CEM_INFLUENCED . 26
Figure 6 – Power constrain examples . 26
Figure 7 – Example of the PowerConstraints based on Figure 6 b) . 27
Figure 8 – Example which illustrates the effect of the minimal power envelope element
duration . 28
Figure 9 – Example of a power profile definition . 29
Figure 10 – Example system description for the operation mode based control type . 31
Figure 11 – Visual example of how the factor maps to power values . 32
Figure 12 – Example for fill rate based control . 33
Figure 13 – Example of the actuator details of fill rate based control . 34
Figure 14 – Example of an operation mode for fill rate based control . 35
Figure 15 – Schematic overview of the data the resource manager send to the CEM . 36
Figure 16 – Example of the operation modes in Demand Driven Based Control . 37
Figure 17 – PowerForecast . 43
Figure 18 – PowerForecastElement . 44
Figure 19 – State diagram for instruction status . 63
Figure 20 – Interaction pattern for 'update resource manager details' task . 66
Figure 21 – Interaction pattern for 'activate control type' task . 66
Figure 22 – Interaction pattern for the 'update active control type' task . 67
Figure 23 – Interaction pattern for the 'communicate power measurement' task . 67
Figure 24 – Interaction pattern for the 'update power forecast' task. 68
Figure 25 – Interaction pattern for the 'revoke power forecast' task . 68
Figure 26 – Interaction pattern for the 'update power constraints' task . 69
Figure 27 – Interaction pattern for the 'revoke power constraints' task . 69
Figure 28 – Interaction pattern for the 'update energy constraints' task . 70
Figure 29 – Interaction pattern for the 'revoke energy constraints' task . 71
Figure 30 – Interaction pattern for 'process instruction' task . 71
Figure 31 – Interaction pattern for the 'revoke instruction' task. 72
Figure 32 – Interaction pattern for the 'update power profile definition' task . 72
Figure 33 – Interaction pattern for the 'revoke power profile definition' task . 73
Figure 34 – Interaction pattern for 'update power profile status' task . 73
Figure 35 – Interaction pattern for 'process schedule instruction' task . 74
Figure 36 – Interaction pattern for the 'revoke schedule instruction' task . 74
Figure 37 – Interaction pattern for 'process start interruption instruction' task . 75
Figure 38 – Interaction pattern for the 'revoke start interruption instruction' task . 75
Figure 39 – Interaction pattern for 'process end interruption instruction' task . 76
Figure 40 – Interaction pattern for the 'revoke end interruption instruction' task . 76
Figure 41 – Interaction pattern for the 'update system description' task. 77
Figure 42 – Interaction pattern for the 'revoke system description' task . 78
Figure 43 – Interaction pattern for 'update status' task . 78
Figure 44 – Interaction pattern for 'update timer status' task . 78
Figure 45 – Interaction pattern for the 'process instruction' task . 79
Figure 46 – Interaction pattern for the 'revoke instruction' task. 79
Figure 47 – Interaction pattern for the 'update system description' task. 80
Figure 48 – Interaction pattern for the 'revoke system description' task . 80
Figure 49 – Interaction pattern for 'update actuator status' task . 81
Figure 50 – Interaction pattern for 'update storage status' task . 81
Figure 51 – Interaction pattern for 'update timer status' task . 82
Figure 52 – Interaction pattern for the 'update leakage behaviour' task . 82
Figure 53 – Interaction pattern for the 'revoke leakage behaviour' task . 82
Figure 54 – Interaction pattern for the 'update usage forecast' task. 83
Figure 55 – Interaction pattern for the 'revoke usage forecast' task . 83
Figure 56 – Interaction pattern for the 'update fill level target profile' task . 84
Figure 57 – Interaction pattern for the 'revoke fill level target profile' task . 84
Figure 58 – Interaction pattern for 'process instruction' task . 85
Figure 59 – Interaction pattern for the 'revoke instruction' task. 85
Figure 60 – Interaction pattern for the 'update demand driven system description' task . 86
Figure 61 – Interaction pattern for the 'revoke demand driven system description' task . 86
Figure 62 – Interaction pattern for 'update actuator status' task . 87
Figure 63 – Interaction pattern for 'update timer status' task . 87
Figure 64 – Interaction pattern for the 'update average demand rate forecast' task . 88
Figure 65 – Interaction pattern for the 'revoke average demand rate forecast' task . 88
Figure 66 – Interaction pattern for 'process instruction' task . 89
Figure 67 – Interaction pattern for the 'revoke instruction' task. 89
Figure A.1 – Solving conflicting power load . 95
Figure A.2 – Charging an EV . 97
Figure A.3 – Charging an EV . 98

Table 1 – Data types . 37
Table 2 – ResourceManagerDetails . 39
Table 3 – PowerValue . 40
Table 4 – PowerForecastValue . 40
Table 5 – PowerRange . 40
Table 6 – NumberRange . 41
Table 7 – PowerMeasurement. 41
Table 8 – Role . 41
Table 9 – ReceptionStatus . 41
Table 10 – Transition . 41
Table 11 – Timer. 42
Table 12 – InstructionStatusUpdate . 42
Table 13 – PowerForecast . 43
Table 14 – PowerForecastElement . 44
Table 15 – PEBC.PowerConstraints . 44
Table 16 – PEBC.AllowedLimitRange . 45
Table 17 – PEBC.EnergyConstraint . 45
Table 18 – PEBC.PowerEnvelope . 46
Table 19 – PEBC.PowerEnvelopeElement . 46
Table 20 – PEBC.Instruction . 46
Table 21 – PPBC.PowerProfileDefinition . 47
Table 22 – PPBC.PowerSequenceContainer . 47
Table 23 – PPBC.PowerSequence . 48
Table 24 – PPBC.PowerSequenceElement . 48
Table 25 – PPBC.PowerProfileStatus. 48
Table 26 – PPBC.PowerSequenceContainerStatus . 48
Table 27 – PPBC.ScheduleInstruction . 49
Table 28 – PPBC.StartInterruptionInstruction . 49
Table 29 – PPBC.EndInterruptionInstruction . 50
Table 30 – OMBC.SystemDescription . 50
Table 31 – OMBC.Status . 50
Table 32 – OMBC.TimerStatus. 51
Table 33 – OMBC.OperationMode . 51
Table 34 – OMBC.Instruction . 52
Table 35 – FRBC.SystemDescription . 52
Table 36 – FRBC.ActuatorDescription . 52
Table 37 – FRBC.ActuatorStatus . 53
Table 38 – FRBC.TimerStatus . 53
Table 39 – FRBC.OperationMode . 53
Table 40 – FRBC.OperationModeElement . 54
Table 41 – FRBC.StorageDescription. 54
Table 42 – FRBC.StorageStatus . 55
Table 43 – FRBC.LeakageBehaviour . 55
Table 44 – FRBC.LeakageBehaviourElement . 55
Table 45 – FRBC.Instruction . 55
Table 46 – FRBC.UsageForecast . 56
Table 47 – FRBC.UsageForecastElement . 56
Table 48 – FRBC.FillLevelTargetProfile . 57
Table 49 – FRBC.FillLevelTargetProfileElement. 57
Table 50 – DDBC.SystemDescription . 57
Table 51 – DDBC.ActuatorDescription . 58
Table 52 – DDBC.ActuatorStatus . 58
Table 53 – DDBC.TimerStatus . 58
Table 54 – DDBC.OperationMode . 59
Table 55 – DDBC.Instruction. 59
Table 56 – DDBC.AverageDemandRateForecast . 60
Table 57 – DDBC.AverageDemandRateForecastElement . 60
Table 58 – Enumeration of RoleType types . 60
Table 59 – Enumeration of commodity types . 61
Table 60 – Enumeration of CommodityQuantity types . 61
Table 61 – Examples of enumeration of currency types according to ISO 4217 . 61
Table 62 – Enumeration of InstructionStatus types . 62
Table 63 – Enumeration of ControlType types . 63
Table 64 – Enumeration of PowerForecastType types . 63
Table 65 – Enumeration of PowerEnvelopeLimitType types . 64
Table 66 – Enumeration of PowerEnvelopeConsequenceType types . 64
Table 67 – Enumeration of ReceptionStatusValues types . 64
Table 68 – Enumeration of PPBC.PowerSequenceStatus types . 64
Table A.1 – Use cases mainly describe energy management . 90
Table A.2 – Use cases overview . 90

INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________
Energy efficiency - Customer energy management system -
Part 2-2: Data model and messaging - Interface between the customer
energy manager and resource managers

FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for
standardization comprising all national electrotechnical committees (IEC National Committees).
The object of IEC is to promote international co-operation on all questions concerning
standardization in the electrical and electronic fields. To this end and in addition to other
activities, IEC publishes International Standards, Technical Specifications, Technical Reports,
Publicly Available Specifications (PAS) and Guides (hereafter referred to as "IEC
Publication(s)"). Their preparation is entrusted to technical committees; any IEC National
Committee interested in the subject dealt with may participate in this preparatory work.
International, governmental and non-governmental organizations liaising with the IEC also
participate in this preparation. IEC collaborates closely with the International Organization for
Standardization (ISO) in accordance with conditions determined by agreement between the two
organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as
possible, an international consensus of opinion on the relevant subjects since each technical
committee has representation from all interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted
by IEC National Committees in that sense. While all reasonable efforts are made to ensure that
the technical content of IEC Publications is accurate, IEC cannot be held responsible for the
way in which they are used or for any misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC
Publications transparently to the maximum extent possible in their national and regional
publications. Any divergence between any IEC Publication and the corresponding national or
regional publication shall be clearly indicated in the latter.
5) IEC itself does not provide any attestation of conformity. Independent certification bodies
provide conformity assessment services and, in some areas, access to IEC marks of conformity.
IEC is not responsible for any services carried out by independent certification bodies.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including
individual experts and members of its technical committees and IEC National Committees for
any personal injury, property damage or other damage of any nature whatsoever, whether direct
or indirect, or for costs (including legal fees) and expenses arising out of the publication, use
of, or reliance upon, this IEC Publication or any other IEC Publications.
8) Attention is drawn to the Normative references cited in this publication. Use of the referenced
publications is indispensable for the correct application of this publication.
9) IEC draws attention to the possibility that the implementation of this document may involve
the use of (a) patent(s). IEC takes no position concerning the evidence, validity or applicability
of any claimed patent rights in respect thereof. As of the date of publication of this document,
IEC had not received notice of (a) patent(s), which may be required to implement this document.
However, implementers are cautioned that this may not represent the latest information, which
may be obtained from the patent database available at https://patents.iec.ch. IEC shall not be
held responsible for identifying any or all such patent rights.
IEC 63402-2-2 has been prepared by subcommittee 23K: Electrical energy efficiency products,
of IEC technical committee 23: Electrical accessories. It is an International Standard.
It has the status of a group energy efficiency publication in accordance with IEC Guide 118,
Preparation of basic and group energy efficiency publications including energy efficiency
aspects.
The text of this International Standard is based on the following documents:
Draft Report on voting
23K/134/FDIS 23K/138/RVD
Full information on the voting for its approval can be found in the report on voting indicated in
the above table.
The language used for the development of this International Standard is English.
This document was drafted in accordance with ISO/IEC Directives, Part 2, and developed in
accordance with ISO/IEC Directives, Part 1 and ISO/IEC Directives, IEC Supplement, available
at www.iec.ch/members_experts/refdocs. The main document types developed by IEC are
described in greater detail at www.iec.ch/publications.
A list of all parts in the IEC 63402 series, published under the general title Energy efficiency -
Customer energy management systems, can be found on the IEC website.
The committee has decided that the contents of this document will remain unchanged until the
stability date indicated on the IEC website under webstore.iec.ch in the data related to the
specific document. At this date, the document will be
– reconfirmed,
– withdrawn, or
– revised.
Introduction
Over recent decades, energy production and its consumption patterns have changed
dramatically. Although central energy production is still dominant, the trend for distributed
production is distinctive following an increasing number of renewables. Alternative energy
sources are highly fluctuating in their production capabilities, which can result in the grid
operators having difficulty to keep a balance between energy production and consumption. The
complexity of keeping the grid reliable is further increased by the change in the electric energy
consumption and production of the customer itself, e.g., the use of electric vehicles and
personal generation facilities.
A Smart Grid allows the grid operator to be flexible and reactive. Such reactivity uses
communication between energy consuming and producing entities, from single
...


IEC 63402-2-2 ®
Edition 1.0 2026-08
NORME
INTERNATIONALE
PUBLICATION HORIZONTALE
PUBLICATION GROUPÉE SUR L’ÉFFICACITÉ ÉNERGÉTIQUE

Efficacité énergétique - Systèmes de gestion d'énergie client –
Part 2-2: Modèle de données et messagerie - Interface entre le gestionnaire
d'énergie client et les gestionnaires de ressources
ICS 03.100.70; 27.015; 29.020  ISBN 978-2-8327-1442-3

Droits de reproduction réservés. Sauf indication contraire, aucune partie de cette publication ne peut être reproduite ni
utilisée sous quelque forme que ce soit et par aucun procédé, électronique ou mécanique, y compris la photocopie et
les microfilms, sans l'accord écrit de l'IEC ou du Comité national de l'IEC du pays du demandeur. Si vous avez des
questions sur le copyright de l'IEC ou si vous désirez obtenir des droits supplémentaires sur cette publication, utilisez
les coordonnées ci-après ou contactez le Comité national de l'IEC de votre pays de résidence.

IEC Secretariat Tel.: +41 22 919 02 11
3, rue de Varembé info@iec.ch
CH-1211 Geneva 20 www.iec.ch
Switzerland
A propos de l'IEC
La Commission Electrotechnique Internationale (IEC) est la première organisation mondiale qui élabore et publie des
Normes internationales pour tout ce qui a trait à l'électricité, à l'électronique et aux technologies apparentées.

A propos des publications IEC
Le contenu technique des publications IEC est constamment revu. Veuillez vous assurer que vous possédez l’édition la
plus récente, un corrigendum ou amendement peut avoir été publié.

Recherche de publications IEC -  IEC Products & Services Portal - products.iec.ch
webstore.iec.ch/advsearchform Découvrez notre puissant moteur de recherche et consultez
La recherche avancée permet de trouver des publications gratuitement tous les aperçus des publications, symboles
IEC en utilisant différents critères (numéro de référence, graphiques et le glossaire. Avec un abonnement, vous aurez
texte, comité d’études, …). Elle donne aussi des toujours accès à un contenu à jour adapté à vos besoins.
informations sur les projets et les publications remplacées
ou retirées. Electropedia - www.electropedia.org
Le premier dictionnaire d'électrotechnologie en ligne au
IEC Just Published - webstore.iec.ch/justpublished monde, avec plus de 22 500 articles terminologiques en
Restez informé sur les nouvelles publications IEC. Just anglais et en français, ainsi que les termes équivalents
dans 25 langues additionnelles. Egalement appelé
Published détaille les nouvelles publications parues.
Disponible en ligne et une fois par mois par email. Vocabulaire Electrotechnique International (IEV) en ligne.

Service Clients - webstore.iec.ch/csc
Si vous désirez nous donner des commentaires sur cette
publication ou si vous avez des questions contactez-
nous: sales@iec.ch.
SOMMAIRE
AVANT-PROPOS . 9
INTRODUCTION . 11
1 Domaine d'application . 12
2 Références normatives . 12
3 Termes, définitions et termes abrégés . 12
3.1 Termes et définitions . 12
3.2 Termes abrégés . 16
4 Gestion d'énergie . 17
4.1 Vue d'ensemble architecturale . 17
4.2 Description . 17
4.3 Rôles Gestion d'énergie . 18
4.3.1 Généralités . 18
4.3.2 Rôle Producteur d'énergie . 19
4.3.3 Rôle Consommateur d'énergie . 19
4.3.4 Rôle Stockage d'énergie . 20
5 Gestionnaire de ressources . 21
6 Gestionnaire d'énergie client (CEM) . 22
6.1 Généralités . 22
6.2 Optimisation locale . 23
6.3 Contrôle implicite . 24
6.4 Contrôle explicite . 24
6.5 Récapitulatif . 25
7 Concepts relatifs à la gestion d'énergie . 25
7.1 Généralités . 25
7.2 Philosophie de conception . 25
7.3 Condition anormale . 26
7.4 Mesurages de puissance . 26
7.5 Prévisions de puissance . 26
7.6 Types de contrôles . 27
7.6.1 Généralités . 27
7.6.2 Contrôle fondé sur une enveloppe de puissance . 27
7.6.3 Contrôle fondé sur un profil de puissance . 32
7.6.4 Contrôle fondé sur le mode de fonctionnement . 34
7.6.5 Contrôle fondé sur le taux de remplissage . 37
7.6.6 Contrôle piloté par la demande . 40
8 Modèles de données de gestion de l'énergie . 42
8.1 Types de données de base . 42
8.1.1 Généralités . 42
8.1.2 Concepts communs relatifs au temps. 43
8.1.3 Concepts communs relatifs aux identificateurs . 43
8.1.4 Concepts communs relatifs aux chaînes . 43
8.1.5 Signification du caractère facultatif . 44
8.2 Gestionnaire de ressources . 44
8.2.1 ResourceManagerDetails . 44
8.2.2 PowerValue . 45
8.2.3 PowerForecastValue. 46
8.2.4 PowerRange . 46
8.2.5 NumberRange . 47
8.2.6 PowerMeasurement . 47
8.2.7 Role . 47
8.2.8 ReceptionStatus . 47
8.2.9 Transition . 48
8.2.10 Timer . 48
8.2.11 InstructionStatusUpdate . 49
8.3 Prévision de puissance . 49
8.3.1 Description . 49
8.3.2 PowerForecast . 50
8.3.3 PowerForecastElement . 50
8.4 Types de contrôles . 51
8.4.1 Contrôle fondé sur une enveloppe de puissance . 51
8.4.2 Contrôle fondé sur un profil de puissance . 55
8.4.3 Contrôle fondé sur le mode de fonctionnement . 59
8.4.4 Contrôle fondé sur le taux de remplissage . 62
8.4.5 Contrôle piloté par la demande . 69
8.5 Énumérations . 73
8.5.1 RoleType . 73
8.5.2 Commodity . 74
8.5.3 CommodityQuantity . 74
8.5.4 Currency . 75
8.5.5 InstructionStatus . 75
8.5.6 ControlType . 77
8.5.7 PowerForecastType . 77
8.5.8 PEBC.PowerEnvelopeLimitType . 77
8.5.9 PEBC.PowerEnvelopeConsequenceType . 78
8.5.10 ReceptionStatusValues . 78
8.5.11 PPBC.PowerSequenceStatus . 78
9 Communication . 79
9.1 Généralités . 79
9.2 Tâches génériques . 80
9.2.1 Mettre à jour les informations détaillées relatives au gestionnaire de
ressources . 80
9.2.2 Activer le type de contrôle . 80
9.2.3 Mettre à jour le type de contrôle actif . 81
9.2.4 Communiquer le mesurage de puissance . 81
9.2.5 Mettre à jour la prévision de puissance . 82
9.2.6 Révoquer la prévision de puissance . 82
9.3 Tâches de contrôle fondé sur une enveloppe de puissance . 83
9.3.1 Mettre à jour les contraintes de puissance . 83
9.3.2 Révoquer les contraintes de puissance . 83
9.3.3 Mettre à jour le plan de puissance . 84
9.3.4 Mettre à jour les contraintes d'énergie . 84
9.3.5 Révoquer les contraintes d'énergie . 85
9.3.6 Traiter l'instruction . 85
9.3.7 Révoquer l'instruction . 86
9.4 Tâches de contrôle fondé sur un profil de puissance . 86
9.4.1 Mettre à jour la définition du profil de puissance . 86
9.4.2 Révoquer la définition du profil de puissance . 87
9.4.3 Mettre à jour le statut du profil de puissance. 87
9.4.4 Traiter l'instruction de planification . 88
9.4.5 Révoquer l'instruction de planification . 88
9.4.6 Traiter l'instruction d'interruption de début . 89
9.4.7 Révoquer l'instruction d'interruption de début . 89
9.4.8 Traiter l'instruction d'interruption de fin . 90
9.4.9 Révoquer l'instruction d'interruption de fin . 91
9.5 Tâches de contrôle fondé sur le mode de fonctionnement . 91
9.5.1 Mettre à jour la description du système . 91
9.5.2 Révoquer la description du système . 92
9.5.3 Mettre à jour le statut . 92
9.5.4 Mettre à jour le statut du temporisateur . 93
9.5.5 Traiter l'instruction . 93
9.5.6 Révoquer l'instruction . 94
9.6 Tâches de contrôle fondé sur le taux de remplissage . 94
9.6.1 Mettre à jour la description du système . 94
9.6.2 Révoquer la description du système . 95
9.6.3 Mettre à jour le statut de l'actionneur . 95
9.6.4 Mettre à jour le statut du stockage . 96
9.6.5 Mettre à jour le statut du temporisateur . 96
9.6.6 Mettre à jour le comportement de fuite . 97
9.6.7 Révoquer le comportement de fuite . 97
9.6.8 Mettre à jour la prévision d'utilisation . 98
9.6.9 Révoquer la prévision d'utilisation . 98
9.6.10 Mettre à jour le profil cible de niveau de remplissage . 99
9.6.11 Révoquer le profil cible de niveau de remplissage . 99
9.6.12 Traiter l'instruction . 100
9.6.13 Révoquer l'instruction . 100
9.7 Tâches de contrôle piloté par la demande . 101
9.7.1 Mettre à jour la description du système . 101
9.7.2 Révoquer la description du système . 102
9.7.3 Mettre à jour le statut de l'actionneur . 102
9.7.4 Mettre à jour le statut du temporisateur . 103
9.7.5 Mettre à jour la prévision du prix moyen du kilowatt . 103
9.7.6 Révoquer la prévision du prix moyen du kilowatt. 104
9.7.7 Traiter l'instruction . 104
9.7.8 Révoquer l'instruction . 105
Annexe A (informative) Cas d'utilisation . 106
A.1 Vue d'ensemble . 106
A.2 Organisation . 107
A.2.1 UC_EM_O100: Configuration du CEM dans le réseau . 107
A.2.2 UC_EM_O101: Configuration du CEM maître avec les justificatifs
d'identité de l'opérateur de réseau intelligent . 108
A.3 Planification . 108
A.4 Gestion . 109
A.4.1 UC_EM_M300: Le CEM sélectionne d'autres séquences énergétiques
en fonction des coûts énergétiques. 109
A.4.2 UC_EM_M301: Le CEM modifie l'heure de début de la séquence
énergétique . 109
A.4.3 UC_EM_M302: Le CEM modifie un profil énergétique pour une
utilisation provisoire de l'énergie stockée . 110
A.4.4 UC_EM_M303: La puissance demandée ne peut pas être fournie par le
réseau domestique . 110
A.4.5 UC_EM_M304: Conflit de facteur de charge de deux véhicules
électriques . 111
A.4.6 UC_EM_M305: L'EMG demande une économie d'énergie temporaire . 112
A.4.7 UC_EM_M306: Le stockage d'énergie demande une priorité élevée . 113
A.5 Études de cas . 114
A.5.1 UC_EM_M307: Charge d'un VE dans le contexte de PV à limitation de
puissance avec le mode de contrôle dynamique de l'ISO 15118-20 . 114
A.5.2 UC_EM_M308: Charge d'un VE dans le contexte de PV à limitation de
puissance avec le mode de contrôle planifié de l'ISO 15118 (série) [10]
et incitations financières . 116
Bibliographie . 118

Figure 1 – Vue d'ensemble architecturale du réseau intelligent dans les locaux . 17
Figure 2 – Exemple de la manière dont différents profils de puissance peuvent
atteindre le même état cible . 18
Figure 3 – Exemples de combinaisons de gestionnaire de ressources et HBES, SGTB,
appareil électroménager intelligent ou appareil intelligent, ainsi que toutes
combinaisons de ces éléments . 21
Figure 4 – Exemple de PEBC.Instruction provenant du CEM qui contient une
PowerEnvelope . 28
Figure 5 – Exemple montrant comment une PowerEnvelope et une PowerForecast de
type GENUINE donnent une PowerForecast de type CEM_INFLUENCED . 29
Figure 6 – Exemples de contraintes de puissance . 30
Figure 7 – Exemple de PowerConstraints fondé sur la Figure 6 b) . 31
Figure 8 – Exemple représentant l'effet de la durée minimale des éléments de
l'enveloppe de puissance . 32
Figure 9 – Exemple de définition de profil de puissance . 33
Figure 10 – Exemple de description de système pour le type de contrôle fondé sur le
mode de fonctionnement . 35
Figure 11 – Exemple visuel de la correspondance entre le coefficient et les valeurs de
puissance . 36
Figure 12 – Exemple de contrôle fondé sur le taux de remplissage . 38
Figure 13 – Exemple d'informations détaillées relatives à l'actionneur du contrôle fondé
sur le taux de remplissage . 39
Figure 14 – Exemple de mode de fonctionnement pour le contrôle fondé sur le taux de
remplissage . 40
Figure 15 – Vue d'ensemble schématique des données que le gestionnaire de
ressources envoie au CEM . 41
Figure 16 – Exemple de modes de fonctionnement dans le contrôle piloté par la
demande. 42
Figure 17 – PowerForecast . 49
Figure 18 – PowerForecastElement . 50
Figure 19 – Diagramme d'états pour les états d'instruction . 76
Figure 20 – Modèle d'interaction pour la tâche "Mettre à jour les informations détaillées
relatives au gestionnaire de ressources" . 80
Figure 21 – Modèle d'interaction pour la tâche "Activer le type de contrôle" . 80
Figure 22 – Modèle d'interaction pour la tâche "Mettre à jour le type de contrôle actif" . 81
Figure 23 – Modèle d'interaction pour la tâche "Communiquer le mesurage de
puissance" . 81
Figure 24 – Modèle d'interaction pour la tâche "Mettre à jour la prévision de puissance" . 82
Figure 25 – Modèle d'interaction pour la tâche "Révoquer la prévision de puissance" . 82
Figure 26 – Modèle d'interaction pour la tâche "Mettre à jour les contraintes de
puissance" . 83
Figure 27 – Modèle d'interaction pour la tâche "Révoquer les contraintes de
puissance" . 83
Figure 28 – Modèle d'interaction pour la tâche "Mettre à jour les contraintes d'énergie" . 84
Figure 29 – Modèle d'interaction pour la tâche "Révoquer les contraintes d'énergie" . 85
Figure 30 – Modèle d'interaction pour la tâche "Traiter l'instruction" . 85
Figure 31 – Modèle d'interaction pour la tâche "Révoquer l'instruction" . 86
Figure 32 – Modèle d'interaction pour la tâche "Mettre à jour la définition du profil de
puissance" . 86
Figure 33 – Modèle d'interaction pour la tâche "Révoquer la définition du profil de
puissance" . 87
Figure 34 – Modèle d'interaction pour la tâche "Mettre à jour le statut du profil de
puissance" . 87
Figure 35 – Modèle d'interaction pour la tâche "Traiter l'instruction de planification" . 88
Figure 36 – Modèle d'interaction pour la tâche "Révoquer l'instruction de planification" . 88
Figure 37 – Modèle d'interaction pour la tâche "Traiter l'instruction d'interruption de
début" . 89
Figure 38 – Modèle d'interaction pour la tâche "Révoquer l'instruction d'interruption de
début" . 89
Figure 39 – Modèle d'interaction pour la tâche "Traiter l'instruction d'interruption de fin" . 90
Figure 40 – Modèle d'interaction pour la tâche "Révoquer l'instruction d'interruption de
fin" 91
Figure 41 – Modèle d'interaction pour la tâche "Mettre à jour la description du
système" . 91
Figure 42 – Modèle d'interaction pour la tâche "Révoquer la description du système" . 92
Figure 43 – Modèle d'interaction pour la tâche "Mettre à jour le statut" . 92
Figure 44 – Modèle d'interaction pour la tâche "Mettre à jour le statut du
temporisateur" . 93
Figure 45 – Modèle d'interaction pour la tâche "Traiter l'instruction" . 93
Figure 46 – Modèle d'interaction pour la tâche "Révoquer l'instruction" . 94
Figure 47 – Modèle d'interaction pour la tâche "Mettre à jour la description du
système" . 94
Figure 48 – Modèle d'interaction pour la tâche "Révoquer la description du système" . 95
Figure 49 – Modèle d'interaction pour la tâche "Mettre à jour le statut de l'actionneur" . 95
Figure 50 – Modèle d'interaction pour la tâche "Mettre à jour le statut du stockage" . 96
Figure 51 – Modèle d'interaction pour la tâche "Mettre à jour le statut du
temporisateur" . 96
Figure 52 – Modèle d'interaction pour la tâche "Mettre à jour le comportement de fuite" . 97
Figure 53 – Modèle d'interaction pour la tâche "Révoquer le comportement de fuite" . 97
Figure 54 – Modèle d'interaction pour la tâche "Mettre à jour la prévision d'utilisation" . 98
Figure 55 – Modèle d'interaction pour la tâche "Révoquer la prévision d'utilisation" . 98
Figure 56 – Modèle d'interaction pour la tâche "Mettre à jour le profil cible de niveau
de remplissage" . 99
Figure 57 – Modèle d'interaction pour la tâche "Révoquer le profil cible de niveau de
remplissage" . 99
Figure 58 – Modèle d'interaction pour la tâche "Traiter l'instruction" . 100
Figure 59 – Modèle d'interaction pour la tâche "Révoquer l'instruction" . 100
Figure 60 – Modèle d'interaction pour la tâche "Mettre à jour la description du système
piloté par la demande" . 101
Figure 61 – Modèle d'interaction pour la tâche "Révoquer la description du système
piloté par la demande" . 102
Figure 62 – Modèle d'interaction pour la tâche "Mettre à jour le statut de l'actionneur" . 102
Figure 63 – Modèle d'interaction pour la tâche "Mettre à jour le statut du
temporisateur" . 103
Figure 64 – Modèle d'interaction pour la tâche "Mettre à jour la prévision du prix
moyen du kilowatt" . 103
Figure 65 – Modèle d'interaction pour la tâche "Révoquer la prévision du prix moyen
du kilowatt" . 104
Figure 66 – Modèle d'interaction pour la tâche "Traiter l'instruction" . 104
Figure 67 – Modèle d'interaction pour la tâche "Révoquer l'instruction" . 105
Figure A.1 – Résolution d'un conflit de facteur de charge . 112
Figure A.2 – Charge d'un VE . 114
Figure A.3 – Charge d'un VE . 116

Tableau 1 – Types de données . 42
Tableau 2 – ResourceManagerDetails . 45
Tableau 3 – PowerValue . 45
Tableau 4 – PowerForecastValue . 46
Tableau 5 – PowerRange . 46
Tableau 6 – NumberRange . 47
Tableau 7 – PowerMeasurement . 47
Tableau 8 – Role . 47
Tableau 9 – ReceptionStatus . 47
Tableau 10 – Transition . 48
Tableau 11 – Timer . 48
Tableau 12 – InstructionStatusUpdate . 49
Tableau 13 – PowerForecast . 50
Tableau 14 – PowerForecastElement . 50
Tableau 15 – PEBC.PowerConstraints . 51
Tableau 16 – PEBC.AllowedLimitRange . 52
Tableau 17 – PEBC.EnergyConstraint . 53
Tableau 18 – PEBC.PowerEnvelope . 54
Tableau 19 – PEBC.PowerEnvelopeElement . 54
Tableau 20 – PEBC.Instruction . 55
Tableau 21 – PPBC.PowerProfileDefinition . 55
Tableau 22 – PPBC.PowerSequenceContainer . 56
Tableau 23 – PPBC.PowerSequence . 56
Tableau 24 – PPBC.PowerSequenceElement . 56
Tableau 25 – PPBC.PowerProfileStatus . 57
Tableau 26 – PPBC.PowerSequenceContainerStatus . 57
Tableau 27 – PPBC.ScheduleInstruction . 58
Tableau 28 – PPBC.StartInterruptionInstruction . 58
Tableau 29 – PPBC.EndInterruptionInstruction . 59
Tableau 30 – OMBC.SystemDescription . 59
Tableau 31 – OMBC.Status. 60
Tableau 32 – OMBC.TimerStatus . 60
Tableau 33 – OMBC.OperationMode . 61
Tableau 34 – OMBC.Instruction . 61
Tableau 35 – FRBC.SystemDescription . 62
Tableau 36 – FRBC.ActuatorDescription . 62
Tableau 37 – FRBC.ActuatorStatus . 63
Tableau 38 – FRBC.TimerStatus . 63
Tableau 39 – FRBC.OperationMode. 64
Tableau 40 – FRBC.OperationModeElement . 64
Tableau 41 – FRBC.StorageDescription . 65
Tableau 42 – FRBC.StorageStatus . 65
Tableau 43 – FRBC.LeakageBehaviour . 66
Tableau 44 – FRBC.LeakageBehaviourElement . 66
Tableau 45 – FRBC.Instruction . 67
Tableau 46 – FRBC.UsageForecast . 67
Tableau 47 – FRBC.UsageForecastElement . 68
Tableau 48 – FRBC.FillLevelTargetProfile . 68
Tableau 49 – FRBC.FillLevelTargetProfileElement . 69
Tableau 50 – DDBC.SystemDescription . 69
Tableau 51 – DDBC.ActuatorDescription. 70
Tableau 52 – DDBC.ActuatorStatus . 70
Tableau 53 – DDBC.TimerStatus . 71
Tableau 54 – DDBC.OperationMode . 71
Tableau 55 – DDBC.Instruction . 72
Tableau 56 – DDBC.AverageDemandRateForecast . 72
Tableau 57 – DDBC.AverageDemandRateForecastElement . 73
Tableau 58 – Énumération des types de RoleTypes . 73
Tableau 59 – Énumération des types de produits de base . 74
Tableau 60 – Énumération des types de CommodityQuantities . 74
Tableau 61 – Exemples d'énumérations des types de devises selon l'ISO 4217 . 75
Tableau 62 – Énumération des types de InstructionStatus . 75
Tableau 63 – Énumération des types de ControlTypes . 77
Tableau 64 – Énumération des types de PowerForecastTypes . 77
Tableau 65 – Énumération des types de PowerEnvelopeLimitTypes . 77
Tableau 66 – Énumération des types de PowerEnvelopeConsequenceTypes . 78
Tableau 67 – Énumération des types de ReceptionStatusValues . 78
Tableau 68 – Énumération des types de PPBC.PowerSequenceStatus . 78
Tableau A.1 – Cas d'utilisation qui décrivent principalement la gestion d'énergie . 106
Tableau A.2 – Vue d'ensemble des cas d'utilisation . 107

COMMISSION ÉLECTROTECHNIQUE INTERNATIONALE
____________
Efficacité énergétique - Système de gestion d'énergie client -
Partie 2-2: Modèle de données et messagerie - Interface entre le
gestionnaire d'énergie client et les gestionnaires de ressources

AVANT-PROPOS
1) La Commission Électrotechnique Internationale (IEC) est une organisation mondiale de normalisation composée
de l'ensemble des comités électrotechniques nationaux (Comités nationaux de l'IEC). L'IEC a pour objet de
favoriser la coopération internationale pour toutes les questions de normalisation dans les domaines de
l'électricité et de l'électronique. À cet effet, l'IEC – entre autres activités – publie des Normes internationales,
des Spécifications techniques, des Rapports techniques, des Spécifications accessibles au public (PAS) et des
Guides (ci-après dénommés "Publication(s) de l'IEC"). Leur élaboration est confiée à des comités d'études, aux
travaux desquels tout Comité national intéressé par le sujet traité peut participer. Les organisations
internationales, gouvernementales et non gouvernementales, en liaison avec l'IEC, participent également aux
travaux. L'IEC collabore étroitement avec l'Organisation Internationale de Normalisation (ISO), selon des
conditions fixées par accord entre les deux organisations.
2) Les décisions ou accords officiels de l'IEC concernant les questions techniques représentent, dans la mesure du
possible, un accord international sur les sujets étudiés, étant donné que les Comités nationaux de l'IEC intéressés
sont représentés dans chaque comité d'études.
3) Les Publications de l'IEC se présentent sous la forme de recommandations internationales et sont agréées
comme telles par les Comités nationaux de l'IEC. Tous les efforts raisonnables sont entrepris afin que l'IEC
s'assure de l'exactitude du contenu technique de ses publications; l'IEC ne peut pas être tenue responsable de
l'éventuelle mauvaise utilisation ou interprétation qui en est faite par un quelconque utilisateur final.
4) Dans le but d'encourager l'uniformité internationale, les Comités nationaux de l'IEC s'engagent, dans toute la
mesure possible, à appliquer de façon transparente les Publications de l'IEC dans leurs publications nationales
et régionales. Toutes divergences entre toutes Publications de l'IEC et toutes publications nationales ou
régionales correspondantes doivent être indiquées en termes clairs dans ces dernières.
5) L'IEC elle-même ne fournit aucune attestation de conformité. Des organismes de certification indépendants
fournissent des services d'évaluation de conformité et, dans certains secteurs, accèdent aux marques de
conformité de l'IEC. L'IEC n'est responsable d'aucun des services effectués par les organismes de certification
indépendants.
6) Tous les utilisateurs doivent s'assurer qu'ils sont en possession de la dernière édition de cette publication.
7) Aucune responsabilité ne doit être imputée à l'IEC, à ses administrateurs, employés, auxiliaires ou mandataires,
y compris ses experts particuliers et les membres de ses comités d'études et des Comités nationaux de l'IEC,
pour tout préjudice causé en cas de dommages corporels et matériels, ou de tout autre dommage de quelque
nature que ce soit, directe ou indirecte, ou pour supporter les coûts (y compris les frais de justice) et les dépenses
découlant de la publication ou de l'utilisation de cette Publication de l'IEC ou de toute autre Publication de l'IEC,
ou au crédit qui lui est accordé.
8) L'attention est
...