prEN IEC 63474:2025
(Main)Electrical and electronic household and office equipment - Measurement of networked standby power of edge equipment
Electrical and electronic household and office equipment - Measurement of networked standby power of edge equipment
Elektrische und elektronische Haushalts- und Bürogeräte – Messung der Leistungsaufnahme im vernetzten Bereitschaftsbetrieb von Geräten am Netzwerkrand
Appareils électriques et électroniques pour application domestique et équipement de bureau - Mesurage d'énergie en veille avec maintien de la connexion au réseau des équipements de périphérie
Električna in elektronska gospodinjska in pisarniška oprema - Merjenje porabe električne energije v stanju pripravljenosti na robu omrežja
General Information
Relations
Standards Content (Sample)
SLOVENSKI STANDARD
01-julij-2025
Električna in elektronska gospodinjska in pisarniška oprema - Merjenje porabe
električne energije v stanju pripravljenosti na robu omrežja
Electrical and electronic household and office equipment - Measurement of networked
standby power of edge equipment
Elektrische und elektronische Haushalts- und Bürogeräte – Messung der
Leistungsaufnahme im vernetzten Bereitschaftsbetrieb von Geräten am Netzwerkrand
Appareils électriques et électroniques pour application domestique et équipement de
bureau - Mesurage d'énergie en veille avec maintien de la connexion au réseau des
équipements de périphérie
Ta slovenski standard je istoveten z: prEN IEC 63474:2025
ICS:
17.220.20 Merjenje električnih in Measurement of electrical
magnetnih veličin and magnetic quantities
33.160.01 Avdio, video in avdiovizualni Audio, video and audiovisual
sistemi na splošno systems in general
35.020 Informacijska tehnika in Information technology (IT) in
tehnologija na splošno general
97.030 Električni aparati za dom na Domestic electrical
splošno appliances in general
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
100/4306/CDV
COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 63474 ED2
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2025-05-02 2025-07-25
SUPERSEDES DOCUMENTS:
100/4179/CD, 100/4294/CC
IEC TA 19 : ENVIRONMENTAL AND ENERGY ASPECTS FOR MULTIMEDIA SYSTEMS AND EQUIPMENT
SECRETARIAT: SECRETARY:
Germany Mr Andreas Schneider
OF INTEREST TO THE FOLLOWING COMMITTEES: HORIZONTAL FUNCTION(S):
TC 100/TA 19 Horizontal Group Energy Efficiency
TC 59,ACEE
ASPECTS CONCERNED:
Energy Efficiency,Environment
SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING
Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft
for Vote (CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.
This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of which
they are aware and to provide supporting documentation.
Recipients of this document are invited to submit, with their comments, notification of any relevant “In Some Countries”
clauses to be included should this proposal proceed. Recipients are reminded that the CDV stage is the final stage for
submitting ISC clauses. (SEE AC/22/2007 OR NEW GUIDANCE DOC).
TITLE:
Electrical and electronic household and office equipment – Measurement of networked standby
power of edge equipment
PROPOSED STABILITY DATE: 2031
NOTE FROM TC/SC OFFICERS:
The title of IEC 63474:2023 (ED1) 'Electrical and electronic household and office equipment – Measurement
of networked standby power consumption of edge equipment' was adjusted for the 2nd edition to IEC 63474
(ED2) 'Electrical and electronic household and office equipment – Measurement of networked standby power
of edge equipment' (The word 'consumption' was deleted).
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.
IEC 63474 ED2 © IEC 2025 – 2 –
Link to Committee Draft for Vote (CDV) online document:
https://osd.iec.ch/#/editor/archive/089a5056-7faf-4cc2-95e5-38986a08037a/en/CCDV/1
How to access
This link leads you to the Online Standards Development (OSD) platform for National Mirror
Committee’s (NMC) comments. The project draft may be found further down this document.
Resource materials
We recommend NCs to review the available materials to better understand the member commenting
on the OSD platform. This includes the:
• OSD NC roles overview: here
• How to add and submit comments to the IEC: here
Contact
Should you require any assistance, please contact the IEC IT Helpdesk at helpdesk@iec.ch.
IEC 63474 ED2 © IEC 2025 3
CONTENTS
FOREWORD . 5
INTRODUCTION . 7
1 Scope . 8
2 Normative references . 8
3 Terms, definitions and abbreviations . 9
3.1 Terms and definitions . 9
3.1.1 Function related terms and definitions . 9
3.1.2 Mode related terms and definitions . 12
3.1.3 Network related terms and definitions . 13
3.1.4 Other terms and definitions . 14
3.2 Abbreviated terms . 15
4 Information required for testing purposes . 15
4.1 Information about reactivation network port(s) . 15
4.2 Power management function - periods and conditions . 16
4.3 Activation and deactivation of wireless network connections . 16
5 Measurement conditions . 16
5.1 Common requirements . 16
5.2 Test room . 17
5.3 Power supply . 17
5.4 Power measuring instruments . 17
5.5 Configuration of network ports . 17
5.6 Power measurement uncertainty . 17
6 Measurements . 17
6.1 Overview . 17
6.2 Management of wireless networks and radio receivers . 18
6.2.1 General . 18
6.2.2 Wireless network connection management . 19
6.2.3 Radio receiver management . 19
6.3 Preparation of the EUT and general testing aspects . 19
6.4 Power management . 19
6.5 Measurement procedure . 20
6.6 Network port configuration . 20
6.6.1 Configuration for measurement of power in networked standby mode
using individual network ports . 20
6.6.2 Configuration for measurement of power in networked standby mode
with all network ports connected . 21
6.6.3 Configuration for measurement of power in networked standby mode
with all network ports disconnected . 21
6.7 Methods for measuring power . 21
6.7.1 Measurement of power in networked standby mode when connected to
mains power . 21
6.7.2 Measurement of power in networked standby mode when powered by
battery only . 21
7 Test report . 22
7.1 Test and laboratory details . 22
4 IEC CDV 63474 ED2 © IEC 2025
7.2 Details of equipment under test . 22
7.3 Test parameters and network configuration . 22
7.4 Measured and documented data . 23
Annex A (informative) Power modes and functions - conceptual framework . 24
Annex B (normative) Test conditions - Connection types and test conditions . 25
Annex C (informative) Additional considerations for equipment classification and
examples . 26
Annex D (informative) Examples of network technologies and network configurations
.......................................................................................................................... 28
Annex E (informative) Information to be provided to the user and other interested
parties . 29
E.1 Information available online . 29
E.2 Information available in the instructions for use . 29
Annex F (informative) Example of required information for testing template . 30
Annex G (informative) Example of a test report template . 32
Annex H (informative) Recommended EUT preparation flowchart . 34
Annex I (informative) Factors affecting wireless networked standby mode
measurement . 35
I.1 General . 35
I.2 Connection between remote reactivation trigger device and EUT . 35
I.3 Wireless Access Point/ Router/ Bridge . 35
I.4 Device sending the remote reactivation trigger . 36
I.5 Software influence . 36
Bibliography . 37
Figure 1 – Testing overview . 18
Figure A.1 – Category of functions and operating conditions of products in respect to
functions provided (modes) . 24
Figure A.2 – Concept diagram of reactivation function and related terms . 24
Figure H.1 – . 34
Table B.1 – Test conditions by type of connection . 25
Table C.1 – Classification of networked equipment . 26
Table C.2 – Examples of equipment definition and its classification . 26
Table D.1 – Examples of technologies considered for networked standby mode . 28
Table F.1 – Specific information required for testing networked edge equipment . 30
Table F.2 – Specific information required for testing network reactivation using
network ports. 30
Table F.3 – Additional information required for testing network reactivation using
network ports. 30
Table G.1 – Example of a test report template . 32
IEC 63474 ED2 © IEC 2025 5
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________
Electrical and electronic household and office equipment –Measurement
of networked standby power of edge equipment –
FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international
co-operation on all questions concerning standardization in the electrical and electronic fields. To this end and
in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical
Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as "IEC Publication(s)").
Their preparation is entrusted to technical committees; any IEC National Committee interested in the subject
dealt with may participate in this preparatory work. International, governmental and non-governmental
organizations liaising with the IEC also participate in this preparation. IEC collaborates closely with the
International Organization for Standardization (ISO) in accordance with conditions determined by agreement
between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.