Communication networks and systems in substations - Part 10: Conformance testing

Specifies standard techniques for testing of conformance of implementations, as well as specific measurement techniques to be applied when declaring performance parameters. The use of these techniques will enhance the ability of the system integrator to integrate IEDs easily, operate IEDs correctly, and support the applications as intended.

Kommunikationsnetze- und -systeme in Stationen - Teil 10: Konformitätsprüfung

Réseaux et systèmes de communication dans les postes - Partie 10: Essais de conformité

Komunikacijska omrežja in sistemi v postajah – 10. del: Preskušanje skladnosti (IEC 61850-10:2005)

General Information

Status
Withdrawn
Publication Date
13-Jun-2005
Withdrawal Date
30-Apr-2008
Current Stage
9960 - Withdrawal effective - Withdrawal
Start Date
18-Jan-2016
Completion Date
18-Jan-2016

Relations

Buy Standard

Standard
EN 61850-10:2005
English language
47 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


SLOVENSKI STANDARD
01-november-2005
Komunikacijska omrežja in sistemi v postajah – 10. del: Preskušanje skladnosti
(IEC 61850-10:2005)
Communication networks and systems in substations -- Part 10: Conformance testing
Kommunikationsnetze- und -systeme in Stationen -- Teil 10: Konformitätsprüfung
Réseaux et systèmes de communication dans les postes -- Partie 10: Essais de
conformité
Ta slovenski standard je istoveten z: EN 61850-10:2005
ICS:
29.240.30 Krmilna oprema za Control equipment for electric
elektroenergetske sisteme power systems
33.200 Daljinsko krmiljenje, daljinske Telecontrol. Telemetering
meritve (telemetrija)
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

EUROPEAN STANDARD EN 61850-10
NORME EUROPÉENNE
EUROPÄISCHE NORM June 2005
ICS 33.200
English version
Communication networks and systems in substations
Part 10: Conformance testing
(IEC 61850-10:2005)
Réseaux et systèmes de communication Kommunikationsnetze- und -systeme
dans les postes in Stationen
Partie 10: Essais de conformité Teil 10: Konformitätsprüfung
(CEI 61850-10:2005) (IEC 61850-10:2005)

This European Standard was approved by CENELEC on 2005-05-01. CENELEC members are bound to
comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European
Standard the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the Central Secretariat or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and
notified to the Central Secretariat has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Cyprus, Czech
Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Slovakia, Slovenia, Spain, Sweden,
Switzerland and United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung

Central Secretariat: rue de Stassart 35, B - 1050 Brussels

© 2005 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.

Ref. No. EN 61850-10:2005 E
Foreword
The text of document 57/742/FDIS, future edition 1 of IEC 61850-10, prepared by IEC TC 57, Power
systems management and associated information exchange, was submitted to the IEC-CENELEC
parallel vote and was approved by CENELEC as EN 61850-10 on 2005-05-01.
The following dates were fixed:
– latest date by which the EN has to be implemented
at national level by publication of an identical
national standard or by endorsement (dop) 2006-03-01
– latest date by which the national standards conflicting
with the EN have to be withdrawn (dow) 2008-05-01
Annex ZA has been added by CENELEC.
__________
Endorsement notice
The text of the International Standard IEC 61850-10:2005 was approved by CENELEC as a European
Standard without any modification.
__________
- 3 - EN 61850-10:2005
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications
The following referenced documents are indispensable for the application of this document. For dated
references, only the edition cited applies. For undated references, the latest edition of the referenced
document (including any amendments) applies.
NOTE Where an international publication has been modified by common modifications, indicated by (mod), the relevant
EN/HD applies.
Publication Year Title EN/HD Year
1)
IEC/TS 61850-2 - Communication networks and systems in - -
substations
Part 2: Glossary
1)
2)
IEC 61850-4 - Part 4: System and project management EN 61850-4 2002

1) 2)
IEC 61850-5 - Part 5: Communication requirements for EN 61850-5 2003
functions and device models
1) 2)
IEC 61850-6 - Part 6: Configuration description EN 61850-6 2004
language for communication in electrical
substations related to IEDs
1) 2)
IEC 61850-7-1 - Part 7-1: Basic communication structure EN 61850-7-1 2003
for substation and feeder equipment -
Principles and models
1) 2)
IEC 61850-7-2 - Part 7-2: Basic communication structure EN 61850-7-2 2003
for substation and feeder equipment -
Abstract communication service interface
(ACSI)
1) 2)
IEC 61850-7-3 - Part 7-3: Basic communication structure EN 61850-7-3 2003
for substation and feeder equipment -
Common data classes
1) 2)
IEC 61850-7-4 - Part 7-4: Basic communication structure EN 61850-7-4 2003
for substation and feeder equipment -
Compatible logical node classes and data
classes
1) 2)
IEC 61850-8-1 - Part 8-1: Specific Communication Service EN 61850-8-1 2004
Mapping (SCSM) - Mappings to MMS
(ISO 9506-1 and ISO 9506-2) and to
ISO/IEC 8802-3
1)
Undated reference.
2)
Valid edition at date of issue.

Publication Year Title EN/HD Year
1) 2)
IEC 61850-9-1 - Part 9-1: Specific Communication Service EN 61850-9-1 2003
Mapping (SCSM) - Sampled values over
serial unidirectional multidrop point to
point link
1) 2)
IEC 61850-9-2 - Part 9-2: Specific Communication Service EN 61850-9-2 2004
Mapping (SCSM) - Sampled values over
ISO/IEC 8802-3
1) 2)
ISO/IEC 9646-1 - Information technology - Open Systems EN/ISO IEC 9646-1 1996
Interconnection - Conformance testing
methodology and framework
Part 1: General concepts
1) 2)
ISO/IEC 9646-2 - Part 2: Abstract Test Suite specification EN/ISO IEC 9646-2 1996

1) 2)
ISO/IEC 9646-4 - Part 4: Test realization EN/ISO IEC 9646-4 1996

1) 2)
ISO/IEC 9646-5 - Part 5: Requirements on test laboratories EN/ISO IEC 9646-5 1996
and clients for the conformance
assessment process
1) 2)
ISO/IEC 9646-6 - Part 6: Protocol profile test specification EN/ISO IEC 9646-6 1996

INTERNATIONAL IEC
STANDARD 61850-10
First edition
2005-05
Communication networks and systems
in substations –
Part 10:
Conformance testing
 IEC 2005  Copyright - all rights reserved
No part of this publication may be reproduced or utilized in any form or by any means, electronic or
mechanical, including photocopying and microfilm, without permission in writing from the publisher.
International Electrotechnical Commission, 3, rue de Varembé, PO Box 131, CH-1211 Geneva 20, Switzerland
Telephone: +41 22 919 02 11 Telefax: +41 22 919 03 00 E-mail: inmail@iec.ch Web: www.iec.ch
PRICE CODE
Commission Electrotechnique Internationale X
International Electrotechnical Commission
МеждународнаяЭлектротехническаяКомиссия
For price, see current catalogue

– 2 – 61850-10  IEC:2005(E)
CONTENTS
FOREWORD.4
INTRODUCTION.6

1 Scope.7
2 Normative references .7
3 Terms and definitions .8
4 Abbreviated terms .10
5 Introduction to conformance testing.11
5.1 General .11
5.2 Conformance test procedures.12
5.3 Quality assurance and testing .12
5.3.1 General .12
5.3.2 Quality plan .13
5.4 Testing .14
5.4.1 General .14
5.4.2 Use of SCL files .16
5.4.3 Device testing.16
5.5 Documentation of conformance test report .16
6 Device related conformance testing.17
6.1 General guidelines .17
6.1.1 Test methodology .17
6.1.2 Test system architectures.17
6.2 Conformance test procedures.18
6.2.1 General .18
6.2.2 Test procedure requirements .18
6.2.3 Test structure .19
6.2.4 Test cases to test a server .20
6.2.5 Acceptance criteria.37
7 Performance tests .38
7.1 General .38
7.2 Communications latency.38
7.2.1 Application domain .38
7.2.2 Methodology.39
7.3 Time synchronisation and accuracy.40
7.3.1 Application domain .40
7.3.2 Methodology.40
7.3.3 Testing criteria .41
7.3.4 Performance.41
8 Additional tests.41

Annex A (informative) Examples of test procedure template.42

Bibliography.43

61850-10  IEC:2005(E) – 3 –
Figure 1 – Conceptual conformance assessment process .15
Figure 2 – Conceptual test system architecture.18
Figure 3 – Test procedure format.19
Figure 4 – Performance testing (black box principle).39
Figure 5 – Time synchronisation and accuracy test setup .40

Table 1 – Positive test cases .22
Table 2 – Negative test cases .22
Table 3 – Positive test cases .22
Table 4 – Negative test cases .23
Table 5 – Positive test cases .23
Table 6 – Negative test cases .24
Table 7 – Positive test cases .24
Table 8 – Negative test cases .25
Table 9 – Positive test cases .25
Table 10 – Negative test cases .25
Table 11 – Positive test cases .26
Table 12 – Negative test cases .28
Table 13 – Positive test cases .28
Table 14
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.